Highway 4 - Ashdod-Palmahim Section

Israel, Ashdod

roads and interchanges

Completed

Highway 4 - Ashdod-Palmahim Section

Israel, Ashdod

roads and interchanges

Completed

The Ashtrom Group, through the Ashtrom Engineering and Construction subsidiary, is behind the laying of the Ashdod-Palmahim section as part of the Highway 4 widening. The section  was constructed for Netivei Israel (IRoads), joining a long list of highways and main transport arteries constructed by the Company over several decades.

12km.

Length of route

3

New lanes

2016

Completion of works

Highway 4 - Ashdod-Palmahim Section
Highway 4 - Ashdod-Palmahim Section

Widening of Highway 4 by Adding 3 New Lanes 

As part of the widening of Highway 4  along the Palmahim-Ashdod Interchange section, Ashtrom Engineering and Construction laid 3 new traffic lanes in each direction; the section within which the works were carried out is 12 km. long. 

The work process on the section entailed excavation and soil backfilling, paving and the performance of concrete works, including retaining walls and foundation piles. In addition, electrical, lighting and communications systems were installed on the site together with the performance of bridge reconstruction, drainage works and landscape restoration processes in cooperation with the local authorities.